Road Works ImageLocal Roads

Local Road Works
Road No Location Description Likely Duration (Days) Remarks / Contacts
Pont Y Groes Bridge, Heol Cae Gurwen, G.C.G. Bridge Strengthening Works.

Ian Davies Plant Ltd

10/02/15 to 24/04/15
74 Days
Temporary 2 way traffic control 24 hrs Ian Davies - 07971167651

Station Road, Port Talbot Carriageway Resurfacing ( Two consecutive Sundays )

NPTCBC

22/03/15 to 29/03/15
8 Days
ROAD CLOSED - Diversion in operation Euros Thomas - 01639 686454

New Road, Aberdulais, SA10 8HT Trenching in Verge.

CentreGreat for NPTCBC

30/03/15 to 02/04/15
4 Days
Temporary 2 way traffic control 24 hrs

B4282 Aberdulais to Abergarwed Tree Cutting

South Wales aborists Western Power Distribution

27/03/15 to 01/04/15
6 Days
Temporary 2 way traffic control 24 hrs Contact 01639638708

Brunel Way, Baglan Energy Park, adjacent to the Quays building. Road crossing for power supply to new health centre.

Balfour Beaty for WPD

18/04/15 to 27/04/15
10 Days
Temporary 2 way traffic control 24 hrs Contact WPD on 02920361139

A474 Link road between Saltings roundabout and junction of Neath Abbey Road. Public lighting works

Alan Griffiths contractors for NPTCBC

31/03/15 to 02/04/15
3 Days
Lane closures and localised temporary road closures for pubilc lighting works. Contact 08453715050 Contact

45mtrs North of lane from Water Street to approx 40 mtrs North of Water Street, Margam, Port Talbot. Clear blocked duct.

Arvan Civil Enginering for BT.

20/03/15 to 24/03/15
5 Days
Temporary 2 way traffic control 24 hrs Contact Elisa Morgan on 08700500792

A483 FABIAN WAY BETWEEN ELBA CRESCENT AND COUNTY BOUNDARY TEMPORARY REDUCTION OF THE SPEED LIMIT, REDUCTION IN LANE WIDTHS ON THE DUAL CARRIAGEWAY AND PROHOBITION OF CYCLISTS AND TEMPORARY CLOSURE OF FOOT/CYCLE PATH ON FABIAN WAY, CRYMLYN BURROWS, FOR NEW ROAD LAYOUT FOR SWANSEA CAMPUS.

DAWNUS CONSTRUCTION LTD

16/06/14 to 23/03/15
281 Days
Temporary Management works out of peak 09.30 to 15.30. Possible disruption to traffic flow during works. Out of hours 07767896927 Gerrard Northey - 07789504500

Baglan Way, Baglan Moors. Trenching and Streetlighting column installation

CentreGreat for NPTCBC

26/01/15 to 20/03/15
54 Days
Temporary 2 way traffic control 24 hrs Contact: Leanne Baker 01656650481

Wharf Road near Amenity site Upgrade existing carriageway and repair dilapidated road structure.

costain for nptcbc

28/11/14 to 27/03/15
120 Days
Temporary Multi Phase traffic lights 24hrs Ian Thomas - 07799435675

Afondale Terrace Cymmer Port Talbot Landslide

Forestry Comission

02/07/12 to 27/04/15
1030 Days
Temporary 2 way traffic control 24 hrs Out of hours - Amberon 08453715050

Clifford Street Neath Gas Mains replacement

Wales and West Utilities

27/04/15 to 05/06/15
40 Days
Temporary Multi Phase traffic lights 24hrs Contact Beth Spencer on 01792326214

Cramic Way, Port Talbot Construction Works to Port Talbot Parkway Railway Station

Keir / Netwrok Rail

14/04/14 to 04/04/15
356 Days
ROAD CLOSED - Diversion in operation out of hours 07580 529111 Steen Evans - 07580529111

From pedestrianised area to junction of Heilbron Way Lower Station Road, Port Talbot Town Centre Regeneration Works for NPTCBC.

Alun Griffiths

29/09/14 to 22/05/15
236 Days
Temporary 2 way traffic control 24 hrs Paul Napier - 07977280472

A4068 O/s 105 to 117 Gwulym Road, Cwmllynfell. BT cableing.

Enterprise for BT

08/04/15 to 14/04/15
7 Days
Temporary 2 way traffic control 24 hrs Contact call centre on 0800521660

Edwards Terrace, Abergarwed. lay 58 mtrs on duct in the carriageway and 2 mtrs in verge.

Hurley for BT

24/03/15 to 30/03/15
7 Days
Temporary 2 way traffic control 24 hrs Contact Rob Hurley on 07903868970

80 mtrs South of Oakfield House on Tyllwyd Road, Bryncoch. 240 mts of Duct in c/way and costruct a jointing chamber.

Hurley for BT

08/04/15 to 13/05/15
36 Days
Traffic Management Stop/Go Contact Rob Hurley on 07903868970

150 mtrs North from Swn yr Awel House to opposite oakfield House, Tallllwyd Road, Bryncoch. Lay 75 mtrs of duct in c/way and 5 mts in verge.

Hurley for BT

04/04/15 to 21/04/15
18 Days
Traffic Management Stop/Go 18 days Contact Rob Hurley on 07903868970

Cramic Way, Port Talbot at rear of train station. Install a sewer pipe diversion.

Kier Group on behalf of Network Rail

18/02/15 to 04/04/15
46 Days
Temporary 2 way traffic control 24 hrs Contact Steen Evans on 07580529111

Cyd Terrace, New Road, Clyne. New Commonn Supply

CentreGreat for Neath Port Talbot.

08/04/15 to 14/04/15
7 Days
Temporary 2 way traffic control 24 hrs

Dulais Road, Seven Sisters. Trenching work in Verge.

CentreGreat for Neath Port Talbot.

30/03/15 to 02/04/15
4 Days
Temporary Traffic Signals day time only.

Alloy Ind Est, Pontardawe 320 mtrs East of junction of Tawe Terrace. Installation of new telecoms cabinet.

Vodaphone

07/04/15 to 08/04/15
2 Days
Temporary Traffic Signals working day only. Contact Ian Wells on 01724848246

Cramic Way, Port Talbot. Istall sewer pipe diversion

Kier MG (Rail)

18/02/15 to 04/04/15
46 Days
Temporary 2 way traffic control 24 hrs Contact Steen Evans on 07580529111

Disclaimer

The information provided is believed to be correct. However, as much of the information is provided by utility companies, its accuracy can not be guaranteed. For any clarification please telephone 01639 686868.

 

Page Details

  • Share this:
  • Email to a friend

Rate this Page

Rating form

Please Rate this page:* 

*  

 

 


CAPTCHA Image

 
Footer Links DirectGov Preparing for Emergencies Valid CSS Valid Level A W3C-WAI Accessibility SOCITM Better Connected Valid XHTML 1.0 Strict