Skip Navigation

Your feedback will help us improve this website.

Glynneath Flood Alleviation Scheme

Current Flood Risks

  • Flooding to properties on Rock Street and Robert Street from the Gelliceibryn Brook. The existing drainage system does not have enough capacity to convey surface water during certain storms.
  • Flooding to Glynneath town centre. This is from a ford on Glynmelyn Road located on the Nant Y Gwyddyl to the east of Glynneath.
Natural Resources Wales Flood Map

Proposed works

The proposed works will be in two phases.

Works are likely to start August 2022 until July 2023.

Phase 1 and Phase 2 – duration likely to be 9 months

Phase 1 - Works at Rock Street and Lancaster Close.

  • The construction of a new inlet structure / trash screen in the woodland
  • An overflow culvert from the woodland to the River Neath to divert flood flows.

Phase 2 - Works on Nant y Gwyddyl

  • The construction of a new culvert on the ford on Glynmelyn Road. 

Current stage

Planning permission was received in July 2022. The Council have appointed a contractor (Knights Brown Construction Ltd) to build the scheme.

Benefits

  • Reduce the risk of flooding to residential and commercial properties from the Gelliceibryn Brook and Nant Y Gwyddyl ford.
  • Protection to the centre of Glynneath, including Rock Street, Robert Street and Trem Y Glyn Carehome.

Likely disruption

  • Lane Closures on Lancaster Close for services diversions and laying new culvert.
  • Partial closure of the footway along Lancaster Close.
  • Access to Gelliceibryn will be managed during construction.
  • Increased construction traffic to the Site compound located in the south field off Park Avenue.
  • Road Closure of Glynmelyn Road at the ford. A temporary access road will be available during the construction period to maintain access to Glynmelyn Road from Heol Y Glyn (A4109).

Site Location Plan

Downloads

  • Glynneath Flood Alleviation Scheme - Site Location Plan (PDF 4.79 MB)

    m.Id: 33622
    m.ContentType.Alias: nptDocument
    mTitle: Glynneath Flood Alleviation Scheme - Site Location Plan
    mSize: 4.79 MB
    mType: pdf
    m.Url: /media/17855/glynneath-flood-alleviation-scheme-site-location-plan.pdf

Funding

The scheme is funded by the Welsh Government and Neath Port Talbot County Borough Council. 

The current investment value of this scheme is in the region of £3 million pounds.

Contact

If you have any queries on the scheme please contact Neath Port Talbot County Borough Council Drainage department:

Drainage Project Manager
Richard Colman

 

Knights Brown Construction Ltd logo Welsh Government logo Atkins logo