Road Works and Road Closures

Please see Traffic Wales for Motorway and Trunk roads roadwork information.

Local Road Works
Road No Location Description Likely Duration (Days) Remarks / Contacts Graphic
A4109 Main Road, Crynant Railway Bridge To Aberdulais Drainage works 06-APR-21 to 28-MAY-21 53 days Temporary 2 Way Traffic Control 24 hrs
A4069 CANNON STREET, OUTSIDE 10, LOWER BRYNAMMAN NEW LAY SERVICE 6M PUBLIC 24-MAY-21 to 27-MAY-21 4 days Temporary 2 Way Traffic Control 24 hrs
A4230 Aberdulais Roundabout Main Road Aberdulais Traffic Management in place by SWTRA for essential maintenance works to structure 22-MAY-20 to 28-MAY-21 372 days Slow Lane Closure East and West Bound Inner lane closed on the gyratory for bridge support/repair.
A4109 INTERVALLEY ROAD, From pole number 56L6123P69 to pole number 56L6123P68, BANWEN 1 joint hole in tarmac footway and 177m trenching in tarmac footway for under grounding cables 26-APR-21 to 21-MAY-21 26 days Temporary 2 Way Traffic Control 24 hrs
U/C Ty-Draw Hill, 4a, Port Talbot Works to retaining wall, stop/go required for the positioning plant, unloading of materials and loading of skips as required. 10-MAY-21 to 21-JUN-21 43 days ROAD CLOSED - Diversion in operation
B4242 NEATH ROAD, S/O Ty Gwyn, RESOLVEN MJ Quinn to replace pole and recover out of use stay in F/W. 12-JUL-21 to 12-JUL-21 1 days Traffic Management Stop/Go 1 day
A4109 Aberdulais Roundabout Jct Maes Gwyn and Main Road Aberdulais Highway Safety 21-DEC-20 to 28-MAY-21 159 days LANE CLOSURE
C250 Road from Cymmer to Glyncorrwg Glyncorrwg Retaining wall reconstruction works 02-NOV-20 to 30-JUN-21 241 days ROAD CLOSED - Diversion in operation Carl Price Engineering
A4069 CANNON STREET, OUTSIDE 6 BRYNAMMAN ROAD, LOWER BRYNAMMAN NEW LAY CONNECTION 5M PUBLIC 01-JUN-21 to 04-JUN-21 4 days Temporary 2 Way Traffic Control 24 hrs
A474 Penywern Road, Junction of Cadoxton Road Replace Metallic Gas Mains 28-JUN-21 to 20-AUG-21 54 days Multi Phase Temporary Traffic Light
A48 FROM MARGAM ROUNDABOUT TO PYLE ROAD, ROUTE ALONG PYLE ROAD TOWARDS CAEGARW FARM, MARGAM MJ Quinn to replace 2x pole in verge. 30-JUL-21 to 30-JUL-21 1 days Temporary 2 Way Traffic Control 24 hrs
U/C CEFN GELLI, OPPOSITE 3, CWMGWRACH MJ Quinn to replace d pole in f/w 19-JUL-21 to 19-JUL-21 1 days Temporary Multi Phase Traffic Lights 24hrs
U/C Drummau Road, o/s 8, Skewen De Vegetation and Repair Works To The verge 04-MAY-21 to 15-JUN-21 43 days Temporary 2 Way Traffic Control 24 hrs
U/C GOUGH ROAD, opp 38 to 56, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
U/C CYFYNG ROAD, 86 to 127, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
U/C PANTTEG, from 19 to hall on, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
B4434 Neath Road, Resolven POLING WORKS ON BEHALF OF MJ QUINN / OPENREACH 12-JUL-21 to 12-JUL-21 1 days Temporary 2 Way Traffic Control 24 hrs
U/C PENTWYN ESTATE PERIMETER ROAD, OS 8, BAGLAN MJ Quinn to change shell cabinet in verge 13-MAY-21 to 15-MAY-21 3 days Temporary 2 Way Traffic Control 24 hrs
U/C MERVYN TERRACE, Junction of Cwmclais Road & Mervyn Terrace to 1, CWMAVON G19 Scheme 1 - Water Mains Renewal 17-MAY-21 to 12-JUL-21 57 days Temporary Multi Phase Traffic Lights 24hrs
A4069 AMMAN ROAD, O/S 24 IN C/W, LOWER BRYNAMMAN LAYING NEW GAS SERVICE 5M PUBLIC 4M PRIVATE 08-JUN-21 to 11-JUN-21 4 days Temporary 2 Way Traffic Control 24 hrs
A474 PENYWERN ROAD, From Y wern Primary school to Wern road, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
U/C WERN ROAD, 86, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
U/C SCHOOL ROAD, From maes y wern to wern oleu, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
U/C WERN ROAD, opp 100 to 109, YSTALYFERA Access floor box for flex works 12-MAY-21 to 18-MAY-21 7 days Stop And Go Convoy
LLETTY HARRI, O/S 41, PENYCAE TRACE AND REPAIR GAS ESCAPE AND PERMANENTLY REINSTATE WHERE POSSIBLE 13-MAY-21 to 19-MAY-21 7 days Temporary 2 Way Traffic Control 24 hrs
PONTARDAWE ROAD, APPROX 150 MTRS FROM DERWEN HOUSE, RHYDYFRO Repair Leaking Main 14-MAY-21 to 20-MAY-21 7 days Temporary Multi Phase Traffic Lights 24hrs
A48 FROM MARGAM ROUNDABOUT TO PYLE ROAD, OUTSIDE NUMBER 1, MARGAM TRANSFER OF EQUPIMENT AND POLE RECOVERY 30-JUL-21 to 30-JUL-21 1 days Temporary 2 Way Traffic Control 24 hrs
DINAS BAGLAN ROAD, On carrigeway opposite number 36, BAGLAN Repair dangerous chamber in the carriageway 14-MAY-21 to 18-MAY-21 5 days Temporary 2 Way Traffic Control 24 hrs
A4109 Neath Road Crynant Carriageway Resurfacing 12-MAY-21 to 14-MAY-21 3 days Stop And Go Convoy
B4434 Neath Road Tonna Carriageway Resurfacing / RESCHEDULED TBC. Planned to be carried out in July. to days ROAD CLOSED - Diversion in operation
U/C CORPORATION ROAD, Side of 36 MARSH STREET, ABERAVON Excavate in the carriageway to repair chamber - NSO24952 14-MAY-21 to 18-MAY-21 5 days Temporary Multi Phase Traffic Lights 24hrs
CYFYNG ROAD, opp 67, YSTALYFERA replacing old box with new bigger box 21-MAY-21 to 25-MAY-21 5 days Temporary 2 Way Traffic Control 24 hrs
Wern Road, Port Talbot for filming purposes 17-MAY-21 to 18-MAY-21 2 days Temporary Multi Phase Traffic Lights 24hrs
U/C CRYMLYN ROAD, ADJ TO PUMPING STATION, SKEWEN Install New Service Connection 25-MAY-21 to 08-JUN-21 15 days Temporary 2 Way Traffic Control 24 hrs
B4242 Rheola Wood retaining wall New drainage 12-MAY-21 to 17-MAY-21 6 days Temporary 2 Way Traffic Control 24 hrs
HEOL Y GLO, NEAR OAKFIELD HOUSE - O/S PEN-Y-BRYN, MARGAM UNCOVER BURIED BOXES AND RAISE LEVEL OF BURIED BOX AND SURROUNDING GROUND 20-MAY-21 to 22-MAY-21 3 days Temporary 2 Way Traffic Control 24 hrs
B4242 HIGH STREET, O/S 31-35 GLYNNEATH STORES, GLYNNEATH LAY NEW SERVICE - 6M PUBLIC 3M PRIVATE 23-MAY-21 to 27-MAY-21 5 days Temporary 2 Way Traffic Control 24 hrs
A4230 Main Road, O/S NO.124 Bryncoch Gas Mains Replacement 09-JUN-21 to 19-JUL-21 41 days Temporary 2 Way Traffic Control 24 hrs
U/C TABERNACLE STREET, o/s and opp 20/21, SKEWEN 1 joint hole in tarmac footway and 10m trenching in tarmac footway and 4m road crossing in tarmac road for new supply 17-MAY-21 to 19-MAY-21 3 days Temporary 2 Way Traffic Control 24 hrs
B4434 LLETTY DAFYDD, O/S 21A, CLYNE LAY NEW SERVICE - 6M PUBLIC 15M PRIVATE 23-JUN-21 to 29-JUN-21 7 days Temporary 2 Way Traffic Control 24 hrs
A4069 AMMAN ROAD, O/S 4, LOWER BRYNAMMAN LAY NEW SERVICE - 2M PUBLIC 6M PRIVATE 21-JUN-21 to 26-JUN-21 6 days Temporary 2 Way Traffic Control 24 hrs
A4109 Intervalley Road 1 joint hole in tarmac footway and 177m trenching in tarmac footway for under grounding cables All works to be carried out under Amberon Traffic Management Plan 27-APR-21 to 17-MAY-21 21 days Temporary 2 Way Traffic Control 24 hrs
Eastland Road, Neath Carriageway Resurfacing 17-MAY-21 to 21-MAY-21 5 days ROAD CLOSED - Diversion in operation
A474 NEATH ROAD, Outside 234, BRITON FERRY Repair rocking/noisy chamber in the carriageway NSO25300 25-MAY-21 to 27-MAY-21 3 days Temporary 2 Way Traffic Control 24 hrs
Bryndulais Avenue, Seven Sisters Carriageway Resurfacing / RESCHEDULED TBC to days ROAD CLOSED - Diversion in operation
U/C FORGE ROAD, OUTSIDE ST AGNES CHURCH PORT TALBOT 13-MAY-21 to 25-MAY-21 13 days Temporary 2 Way Traffic Control 24 hrs Urgent excavation in highway to locate and repair LV cable fault.
A4230 Main Road, O/S NO.124 Bryncoch Gas Mains Replacement 01-JUN-21 to 08-JUN-21 8 days Temporary Multi Phase Traffic Lights 24hrs