Road No Location Description Likely Duration (Days) Remarks / Contacts
A4109 Aberdulais Roundabout Jct Maes Gwyn and Main Road Aberdulais Highway Safety 16-OCT-21 to 17-OCT-21 2 days ROAD CLOSED - Diversion in operation Road Closure to from 20.00 hrs to 06.00.
A474 Penywern Road, Junction of Cadoxton Road to Junction of Daphne Road Replace Metallic Gas Mains 10-OCT-21 to 17-OCT-21 8 days Temporary Traffic signals when required possible disruption to traffic flow during works
U/C Dynevor Road, outside 71 Skewen New drainage 11-OCT-21 to 21-OCT-21 11 days Temporary Multi Phase Traffic Lights 24hrs
U/C DWR Y FELIN ROAD, NEATH Footpath widening (Numerous dates: Saturday 11th September – 8am to 4pm Sunday 12th September – 8am to 4pm Saturday 18th August – 8am to 4pm Sunday 19th September – 8am to 4pm Saturday 25th September – 8am to 4pm 11-SEP-21 to 26-NOV-21 77 days Temporary Traffic Signals Temporary Lights will be only used if and when its necessary
U/C NEW ROAD, JUST PAST NODDFA BUNGALOW CLYNE MJ Quinn to replace pole in verge. 28-OCT-21 to 28-OCT-21 1 days Temporary 2 way traffic 1 day only
B4286 DEPOT ROAD TO LONDON ROAD LINK, O/S NO1 JERSEY TERRACE, CWMAVON M J Quinn to Install 1m of 1way duct in Carriageway 20-OCT-21 to 22-OCT-21 3 days Temporary 2 Way Traffic Control 24 hrs
U/C BRYNBRYDDAN, Brynbryddan - From Jct of Brynbryddan/Brynna Road to outside No. 7, CWMAVON G19 Scheme 4 - Water Mains Renewal 02-AUG-21 to 22-OCT-21 82 days Temporary Multi Phase Traffic Lights 24hrs
U/C Old Wern Road, Ystalyfera Rebuild retaining wall 29-SEP-21 to 29-OCT-21 31 days ROAD CLOSED - Diversion in operation
A4109 DULAIS ROAD, OUTSIDE 34, SEVEN SISTERS MJ Quinn to replace d pole in footway 21-OCT-21 to 21-OCT-21 1 days Temporary 2 Way Traffic Control 24 hrs
U/C Crymlyn Road, 111 Skewen Re-st cover and frame in carriageway 16-OCT-21 to 20-OCT-21 5 days Temporary 2 Way Traffic Control 24 hrs NK102VM/CIP/408852
A48 TALBOT ROAD, O/S Plaza, PORT TALBOT 71m trenching in modular footway and tarmac road for new supply 21-SEP-21 to 22-OCT-21 32 days Temporary 2 Way Traffic Control 24 hrs
CHURCH ROAD, OUTSIDE 8, CADOXTON TRACE AND REPAIR GAS ESCAPE AND PERMANENTLY REINSTATE WHERE POSSIBLE. 14-OCT-21 to 21-OCT-21 8 days Temporary 2 Way Traffic Control 24 hrs
Ty Newydd, Seven Sisters Bridge Maintenace Works 15-NOV-21 to 19-NOV-21 5 days ROAD CLOSED - Diversion in operation Night time working 2300-06.00
Aberdulais to Crynant Link Road New Service 26-OCT-21 to 28-OCT-21 3 days ROAD CLOSED - Diversion in operation
Cefn Gelli, Blaengwrach, Cwmgwrach Poling works on behalf of BT Openreach 20-OCT-21 to 20-OCT-21 1 days Temporary Multi Phase Traffic Lights 24hrs
U/C High Street, 18 (Premier Shop), Pontardawe Remedial carriageway works 21-OCT-21 to 22-OCT-21 2 days Temporary 2 Way Traffic Control 24 hrs
A48 From Abbots Close Roundabout to Crematorium Roundabout Verge Maintenance works - Slow Lane Closure east and west bound 16-OCT-21 to 17-OCT-21 2 days Slow Lane Closure East and West Bound
A4107 Pen y Cae Road, Port Talbot Collapsed retaining wall 03-OCT-21 to 31-DEC-21 90 days Temporary 2 Way Traffic Control 24 hrs
U/C HEOL Y GLO JCT GLAN YR AFON ROAD MARGAM OPENREACH WORKS TO EXISTING APPARATUS 07-JAN-22 to 07-JAN-22 1 days Multi Phase Temporary Traffic Lights 1 Day BC005OP2W000WCMTF62RCMC1 -2-3.
Heilbronn Way, Velindre, Port Talbot Load 2 items of plant at different intervals in the morning/each day 18-OCT-21 to 22-OCT-21 5 days Temporary Traffic Signals
Dulais Fach Road, Blaenhonddan, Aberdulais Load 2 items of plant at different intervals in the morning 18-OCT-21 to 18-OCT-21 1 days Temporary 2 Way Traffic Control 24 hrs
U/C Castle Drive, Cimla Emergency Temporary Road Closure due to a collapse in the highway 05-OCT-21 to 29-OCT-21 25 days ROAD CLOSED - Diversion in operation
BAGLAN ENERGY PARK ROAD, NEAR THE ROUNDABOUT, PORT TALBOT 79m trenching in tarmac footway and grass verge for new supply 16-OCT-21 to 30-OCT-21 15 days Temporary 2 Way Traffic Control 24 hrs
B4434 NEW ROAD, APPROX 300M EAST OF TONNA HOSPITAL , CLYNE Replace D pole in verge 15-NOV-21 to 15-NOV-21 1 days Temporary 2 Way Traffic Control 24 hrs
B4242 Aberdulais to cwmgwrach Maintenance and Drainage works 04-OCT-21 to 29-OCT-21 26 days Temporary 2 Way Traffic Control 24 hrs TTLS TO BE REMOVED OVER THE WEEEKEND
LONGFORD ROAD, At Railway Bridge, NEATH ABBEY Vegetation removal following bridge strike - 08:00 - 15:00 20-OCT-21 to 20-OCT-21 1 days Temporary 2 Way Traffic Control 24 hrs
BRUNEL WAY, - OPP BAGLAN BURROWS, BAGLAN, PORT TALBOT 129m trenching in tarmac footway and grass verge for new supply 16-OCT-21 to 30-OCT-21 15 days Temporary 2 Way Traffic Control 24 hrs