Road Works and Road Closures

Welcome to the road works web page for Neath Port Talbot where you can find details of anticipated works that are due to take place in the forthcoming week.

Please see Traffic Wales for Motorway and Trunk roads roadwork information.

Local Road Works
Road No Location Description Likely Duration (Days) Remarks / Contacts
Alfred Street, Orchard Street and London Road, Neath Renewal of Traffic Signal Equipment at the above junctions 15-APR-19 to 26-APR-19 12 days Temporary Traffic Signals Multi Phase Traffic Lights
259 Heol Y Gors, Cwmgors Repair Leaking Communication Pipe 16-APR-19 to 22-APR-19 7 days Temporary 2 Way Traffic Control 24 hrs
C250 Sunnyside Terrace, Cymmer Repair / rebuild of masonry wall alongside highway. 11-MAR-19 to 30-APR-19 51 days Temporary 2 Way Traffic Control 24 hrs
110 Burrows Road, Skewen Excavate TH, install UPT + TBH. 25-APR-19 to 01-MAY-19 7 days Temporary 2 Way Traffic Control 24 hrs
Sunnyside Terrace, Cymmer Repair/rebuild of masonry wall alongside highway 11-MAR-19 to 03-MAY-19 54 days Temporary 2 Way Traffic Control 24 hrs
11 Park Avenue, Skewen Excavate trial hole, install UPT + TBH 02-MAY-19 to 09-MAY-19 8 days Temporary 2 Way Traffic Control 24 hrs
76 Pen y Cae, Port Talbot Retaining wall 05-APR-19 to 03-MAY-19 29 days Temporary 2 Way Traffic Control 24 hrs
Old Road, adj to Min y Graig, Skewen Excavate trial hole, install UPT + TBH 30-APR-19 to 07-MAY-19 8 days Temporary Multi Phase Traffic Lights 24hrs
Llantwit Road, Neath Gas Mains Replacement 15-APR-19 to 03-MAY-19 19 days ROAD CLOSED - Diversion in operation
8 Ynysydarren Road, Ystalyfera Mine shaft work - coal board. 26-MAR-19 to 26-APR-19 32 days Temporary 2 Way Traffic Control 24 hrs
99 Brecon Road, Pontardawe New Supply 16-APR-19 to 25-APR-19 10 days Multi Phase Temporary Traffic Light
Owen Jones Way, Bryn New Gas connection 17-APR-19 to 24-APR-19 8 days Temporary 2 Way Traffic Control 24 hrs
adjacent to 23 School Road, Jersey Marine Excavate trial hole, install UPT + TBH 29-APR-19 to 03-MAY-19 5 days Temporary Multi Phase Traffic Lights 24hrs
C0175 Bridge Street, Rhiwfawr Road, Cwmtwrch. Installation of Birco Drain. 15-APR-19 to 26-APR-19 12 days Temporary 2 Way Traffic Control 24 hrs
B4242 Nr Rheola Market Glynneath Road Resolven Carriageway Excavations 17-JUL-18 to 26-APR-19 284 days Temporary 2 way traffic control 24 hrs.
I Cadaxton Road, Main Road, Cadaxton, Neath. Excavate Trial Hole. 16-APR-19 to 24-APR-19 9 days Temporary 2 Way Traffic Control 24 hrs
U/C 92-95 Waun Wen, Cwmavon Collapsed Carriageway. 07-DEC-18 to 07-JUN-19 183 days ROAD CLOSED - Diversion in operation.
Outside 23 Rhodes Avenue, Aberavon, Port Talbot. Lay 9m of ducting in carriageway. 24-APR-19 to 26-APR-19 3 days Stop go boards, working day only.
Longford Road, Skewen maintenance works on railway bridge 15-APR-19 to 19-APR-19 5 days ROAD CLOSED - Diversion in operation working hours 23.00hrs-06.00hrs
Maes Gareth Edwards to 8 Neuadd Road, Gwaun Cae Gurwen New gas connection 16-APR-19 to 23-APR-19 8 days Temporary Multi Phase Traffic Lights 24hrs
Lower Colbren Road, GCG, Neath Port Talbot. Gas Mains Replacement 11-MAR-19 to 19-APR-19 40 days ROAD CLOSED - Diversion in operation Pedestrian access will be maintained at all times.
Park Street, Tonna Gas mains replacement. 06-MAY-19 to 02-JUN-19 28 days Temporary 2 Way Traffic Control 24 hrs
U/C New Street, Heol y Graig, Tonna, Neath. Gas mains replacement 15-APR-19 to 17-MAY-19 33 days ROAD CLOSED - Diversion in operation.
U/C Craddock Street, Lane, Taibach, Port Talbot. Road closure for safety reasons. 21-DEC-18 to 26-APR-19 127 days ROAD CLOSED - Diversion in operation
Heol Cae'r Bont, from junction with Longland Lane to o/s 21, Margam Replace / Transfer services. 03-JUN-19 to 12-JUL-19 40 days Temporary Multi Phase Traffic Lights 24hrs
47 Pentyla Road, Baglan Renew Service 16-APR-19 to 30-APR-19 15 days Temporary 2 Way Traffic Control 24 hrs
Ynys y Darren Road Ystalyfera Installation of Pelican Crossing for safe route to schools 04-MAR-19 to 19-APR-19 47 days Temporary 2 Way Traffic Control 24 hrs
Forster Road, Neath Access to underground boxes on two consecutive Sundays. 05-MAY-19 to 12-MAY-19 8 days
B4434 Llantwit Road, Neath Gas mains replacement. 15-APR-19 to 03-MAY-19 19 days ROAD CLOSED - Diversion in operation
Tan y Groes Street, Abbey Road to Talcennau Road section. Replace defective Man Hole cover. 05-MAY-19 to 05-MAY-19 1 days ROAD CLOSED - Diversion in operation
Heol Las, Pontardawe Replace telegraph pole. 26-JUN-19 to 28-JUN-19 3 days ROAD CLOSED - Diversion in operation