Road Works and Road Closures

Please seeĀ Traffic Wales for Motorway and Trunk roads roadwork information.

Local Road Works
Road No Location Description Likely Duration (Days) Remarks / Contacts
A4063 Jct Maesteg Road, Eastern Avenue, Croeserw Street Lighting repairs 01-DEC-25 to 12-DEC-25 12 days Multi Phase Traffic Light 24 hours
A4069 Graig Road, Twyn Yr Efail, Brynamman Road, Twynrefail Place, Heol Cae Gwaun, Gwaun Cae Gurwen. Cabling works 14-DEC-25 to 14-DEC-25 1 days Temporary Multi Phase Traffic Lights 24hrs Requested Bt to contact Network Rail for permission if crossing the Level Crossing.
A4107 Afan Road, 50, Duffryn Rhonnda Neath Burst Main 29-NOV-25 to 03-DEC-25 5 days Temporary 2 Way Traffic Control 24 hrs
A4107 Afan Valley Road, approximately 250 meters east of its junction with the B4287, Pontrhydyfen Landslide 31-OCT-25 to 31-DEC-25 62 days Temporary 2 Way Traffic Control 24 hrs
A4107 Brytwn Road, Cymmer Manhole Box 15-DEC-25 to 15-DEC-25 1 days Temporary 2 way traffic 1 day only
A4107 Wern Terrace Cymmer Post & Rail Parapet 28-JUL-25 to 31-DEC-25 157 days Temporary 2 Way Traffic Control 24 hrs Email from Matthew Rees on 09.07.2025
A4109 Heol Gaer, Dyffryn Cellwen, to County Boundary to Intervalley Road Duct 15-DEC-25 to 19-DEC-25 5 days Temporary 2 Way Traffic Control 24 hrs
A4109 Station Road, Jct Station Terrace, Seven Sisters Installation 07-DEC-25 to 08-DEC-25 2 days Multi Phase Traffic Light 24 hours
A4109/A4221 A4221 From Dyffryn Cellwen To County Boundary, Rhyd Ffos Ddu to Onllwyn road to Heol Gaer Ducts 03-DEC-25 to 16-DEC-25 14 days Temporary 2 Way Traffic Control 24 hrs
A4221 Heol Gaer, from Dyffryn Cellwen to County Boundary to Intervalley Road. Neath Duct 15-DEC-25 to 19-DEC-25 5 days Temporary 2 Way Traffic Control 24 hrs
A4230 Church Road, Main Road, Cadoxton Gas Mains Replacement 07-JAN-26 to 13-MAR-26 66 days Temporary 2 Way Traffic Control 24 hrs
A4230 Main Road, Cadoxton Main Replacement 19-DEC-25 to 27-FEB-26 71 days Temporary 2 Way Traffic Control 24 hrs
A474 Briton Ferry Road, O/S 94 Neath Link Box 14-DEC-25 to 14-DEC-25 1 days Temporary 2 way traffic 1 day only Pelican Crossing
A474 Pontardawe Road, Baran Road, Perthigwynion Access Road, Pontardawe Sunken Gully 06-JAN-26 to 19-JAN-26 14 days Temporary Multi Phase Traffic Lights 24hrs
A474 Pontardawe Road, Near Entrance to Garth Farm, Pontardawe Poles 16-MAR-26 to 16-MAR-26 1 days Temporary 2 way traffic 1 day only
A48 Heilbronn Way, from Bus Stop Roundabout junction Station Road Port Talbot Safety Zone for Barrier repairs 01-JAN-25 to 31-DEC-25 365 days East Bound Slow Lane Closure Bridges and Structures Team
A48 Heilbronn Way, from the Bus Station to the Railway Station, Port Talbot Barrier Safety Works 01-DEC-25 to 05-DEC-25 5 days Slow Lane Closure East and West Bound
A48 Margam Road, (carriageway)In the lay-by running alongside the roundabout leading to Harbour Way., Margam, Neath Main burst/Safe Working Area 03-OCT-25 to 05-DEC-25 64 days Fast lane Closures East and West Bound
A483 Fabian Way, Jersey Marine.Neath Port Talbot Drainage improvements 03-JUL-25 to 31-JAN-26 213 days Lane Closures
B4242 Pontneathvaughan Road, Centre of Bridge, Neath Trenching 08-DEC-25 to 17-DEC-25 10 days Temporary 2 Way Traffic Control 24 hrs
B4286 Link From B4286 Dan Y Coed, Tabernacle Terrace, Port Talbot Civils 26-NOV-25 to 28-NOV-25 3 days Stop/Go Boards
B4434 Jct of Clos Yr Ysgol, Lletty Dafydd, Clyne New connections 07-JAN-26 to 28-JAN-26 22 days Temporary Multi Phase Traffic Lights 24hrs
B4434 New Road, Nr Noddfa Bungalow to Nr Cefn Y Gelli Clyne Poles & Tree Cutting 15-JAN-26 to 16-JAN-26 2 days Temporary 2 Way Traffic Control 24 hrs
B4434 Wind Street & Old Market Street, Neath Drainage Works for WWA 17-NOV-25 to 17-JAN-26 62 days Lane Closure Lane closure in place with a road closure to connect to the existing WWA apparatus in the highway and the works will be carried out under night time closures.
U/C C250 from Cymmer to Glyncorrwg, Heol Y Glyn, Cymmer Cabling 06-JAN-26 to 16-JAN-26 11 days Multi Phase Traffic Light 24 hours
U/C Cyfyng Road, 65 Ystalyfera New Pole 27-NOV-25 to 28-NOV-25 2 days Temporary 2 Way Traffic Control 24 hrs NO Pelican
U/C Glan rhyd road Pontardwe New Service 25-NOV-25 to 27-NOV-25 3 days ROAD CLOSED - Diversion in operation
U/C Harvey Crescent, 57, Sandfields Civil Engineering 14-JAN-26 to 16-JAN-26 3 days ROAD CLOSED - Diversion in operation
U/C Heol Cae'r Bont Langland Jetting Access 13-NOV-25 to 09-DEC-25 27 days Temporary 2 Way Traffic Control 24 hrs
U/C Heol Cae'r Bont, N/R Longland House, Margam Blockages 09-DEC-25 to 11-DEC-25 3 days Temporary 2 Way Traffic Control 24 hrs
U/C JCT Penywern Road to Jct Alexander Road Rhyddings Blockages 03-DEC-25 to 05-DEC-25 3 days Temporary Multi Phase Traffic Lights 24hrs
U/C Old Road, O/S 80 Neath New Gas Main 03-DEC-25 to 10-DEC-25 8 days Temporary 2 Way Traffic Control 24 hrs
U/C Pen Y Cae Road Port Talbot Civils 04-DEC-25 to 04-DEC-25 1 days Temporary 2 way traffic 1 day only
U/C Penywern Road, from 37 - 81, Bryncoch Blockages 03-DEC-25 to 05-DEC-25 3 days Multi Phase Traffic Light 24 hours
U/C Regent Street West, junction of Railway Terrace, Britton Ferry Bridge Safety Inspections 20-JAN-26 to 21-JAN-26 2 days ROAD CLOSED - Diversion in operation
U/C The Highlands Neath Abbey Gas Mains Investigation 12-JAN-26 to 16-JAN-26 5 days ROAD CLOSED - Diversion in operation
U/C Victoria Road 0/s 91, Sandfields Civil Engineering to Replace Pole 25-JAN-26 to 25-JAN-26 1 days ROAD CLOSED - Diversion in operation
U/C Victoria Road, O/S 91, Sandfields, Port Talbot Overhead Structure 25-JAN-26 to 25-JAN-26 1 days Temporary 2 Way Traffic Control 24 hrs
U/C Victoria Road, O/S 91, Sandfields, Port Talbot Overhead Structure 25-JAN-26 to 25-JAN-26 1 days ROAD CLOSED - Diversion in operation

Share your feedback